The TDJ Group is an Innovator and Leader for Chemistries Used in Industrial Waste Treatment Projects
Read a sample of our case studies below. Check back as we publish more.
- Price Battery Plant Lead Contaminated Soil Case Study
- Soil Remediation Case Studies
- Blastox 215: Metal Stabilization Product
- Blastox Saved $1.4M on Heavy Metal Soil Remediation Project
For more than 30 years, TDJ Group has assisted the metal casting industry (ferrous & non-ferrous), lead paint sandblasting, and soil remediation industries in the stabilization of heavy metal contaminated wastes. More than 1,000,000 tons of industrial wastes have been eliminated or safely stabilized using TDJ chemistries, and more than 150,000,000 square feet of lead paint have been removed using TDJ chemical abrasive additives. Together, this helps minimize the impact of lead hazards across many industries. Companies that perform environmental remediation services are realizing the cost savings and long term stability features that our chemistries afford. TDJ chemistries are the industry model for safe, cost-effective solutions for heavy metal waste treatment.